Current Projects

SEPTA Wayne Junction

  • Mobilization phase; as subcontractor will perform CPM Scheduling, Construction Management, Furnish and Install Furnishings, Wood and Plastic, Heavy Timbers, Glu-Lam Construction, Rough Carpentry, Wood Decking, Platform Edge Strips, Temporary Construction.

SEPTA Temple Station

  • Remove and replace existing sidewalk
  • Installation of new ticket booth
  • Installation of 2 bike shelters and other site furnishings
  • All site landscaping
  • Installation of signage
  • Installation of estate fencing

SEPTA - New Payment Systems (subcontractor)

  • Installation of pedestrian control gates and fencing for all SEPA stations
  • 3 year ongoing project
  • Scheduled to begin in mid-2012

Recently Completed Projects
Image: 
Exton Station Embankment Stabilization 
  • Erosion and Sedimentation control measures, site prepartion and earthwork
  • Electrical conduit repair/maintenance
  • Subgrade restoration using controlled low strength material (CLSM)
  • Rip-rap installation

Image: 
Washington Crossing Gateway, Phase II:  Signage, Upper Makefield Township
  • Installation of 3 Bronze plaques on decorative boulders
  • Installation of a park entrance sign

Image: 
Croydon Station Improvements 
  • Project Management 
  • CPM Scheduling 
  • Site Furnishings (transit shelters, bike racks, newspaper corrals, trash cans) - furnished and installed.

Image: 
Exton Station Retaining Wall

Wall stood firm during hurricane and aftermath.

Click the above photo for a full album of site pictures.
Image: 
 SEPTA Wind Interlocking Down Guy Foundations -
 
 
Click the above photo for a full album of site pictures.
Image: 
Church Road Culvert Slip Line

Click the above photo for a full album of site pictures.
Image: 
Gamesa Steel Plates
Click the above photo for a full album of site pictures.
Image: 

Commercial Building - 6,000 S.F. 


Site work, foundation, structural steel, primary structure on commercial construction project (6000 sq. foot building that now houses a school for autistic children) completed 2010.  DHC Construction performed role of construction manager and contractor.  Required careful and sensitive planning as students were attending school in adjacent existing building.  

Click the above photo for a full album of site pictures.
Langhorn Station Site Furniture 
  • Supplied Site Furniture
Commercial Residential Concrete Formwork, Footings, Pouring, & Finishing 

CPM Scheduling for hire on various projects